Energy & Power
Grid readiness, generation build-out, and power-sector construction labor.
Market Heatmap
Geographic state grid colored by operational exposure tier — portfolio-level exposure mapping at a glance.
Read reportCHIPS-Grid Labor Collision™
CGCI-v1.1 Q3 refresh: quarterly movers, HDS posting demand, apprenticeship reads, directional tightness, and BLS workforce signals. Not proven labor collision.
Read reportWhich State Grids Can Absorb New Load
~1.73M MW interconnection queue across 50 states — grid readiness as the throttle on construction-labor demand.
Read reportPower Build-Out as a Labor Leading Indicator
~288.6 GW planned generation across 2,261 projects — multi-year leading indicator for electrical and civil labor.
Read reportAI Infrastructure Expansion and the Workforce Pressure Cascade
Concurrent AI compute, data-center, and grid build-out — structural workforce dynamics standard analytics undertrack.
Read reportAll Intelligence Reports
Complete thematic intelligence library — sector disruptions, demand concentrations, and leading indicators.
Read reportInfrastructure Watch — July 2026
Monthly WIL signal digest — federal award movers, hiring velocity shifts, WEI tier changes, and the signal of the month for construction workforce planning.
Read reportAll Publications
Full publication feed — metro × role briefs and thematic research, filterable by niche.
Read reportSignal Monitors
Live monitoring programs — data center pipeline, grid constraints, hiring competition, and labor supply.
Read report