Colorado
Overview
Colorado skilled-labor workforce exposure: composite WEI 76 (High, rising) at Q2 2026. IBEW Local 68 ratified a new 3-year agreement effective June 1, 2026 at $70.09/hr total package, escalating to $77.64/hr by 2028 — a real-time signal of compensation pressure. Xcel Energy is fielding 5.8 GW of data center load requests against approximately 6.2 GW of total generating capacity. 88% of AGC Colorado members report labor shortages. A living record, updated each quarter.
Methodology
Institutional workforce intelligence methodology with documented confidence tier, source families, and quarterly refresh cadence.
State workforce context — Colorado
A live public-signal read for Colorado from the Lab's standing trackers — banded and directional, refreshed independently of this brief.
Source: Workforce Exposure Index and federal-award momentum — public_reports (banded). Directional, banded read — not a forecast. Methodology v2 · last updated 2026-05-26. See Live metrics for the full charts.
Version 1.0 · Published 2026-04-01 · Updated Q2 2026 · Permanent ID WIL-RB-2026.2-COLORADO. This record is versioned; the URL is permanent and stable for citation.
Export citation (BibTeX · RIS)
@techreport{WILRB20262COLORADO,
title = {Colorado},
author = {AlphaHire Workforce Intelligence Lab},
institution = {AlphaHire Workforce Intelligence Lab},
type = {Research Brief},
number = {WIL-RB-2026.2-COLORADO},
year = {2026},
note = {Version 1.0; methodology WIL-2026.1},
url = {https://library.alpha-hire.com/library/p/colorado},
}RISTY - RPRT AU - AlphaHire Workforce Intelligence Lab TI - Colorado PY - 2026 PB - AlphaHire Workforce Intelligence Lab M1 - WIL-RB-2026.2-COLORADO ET - Version 1.0 UR - https://library.alpha-hire.com/library/p/colorado AB - Colorado skilled-labor workforce exposure: composite WEI 76 (High, rising) at Q2 2026. IBEW Local 68 ratified a new 3-year agreement effective June 1, 2026 at $70.09/hr total package, escalating to $77.64/hr by 2028 — a real-time signal of compensation pressure. Xcel Energy is fielding 5.8 GW of data center load requests against approximately 6.2 GW of total generating capacity. 88% of AGC Colorado members report labor shortages. A living record, updated each quarter. ER -